35.5 km in 4 nights, 22 leaks — and a rising learning curve.
A night acoustic listening pilot carried out on part of the İsmetpaşa, Cevat Paşa, Namık Kemal, M. Kemal and Fevzipaşa neighbourhoods of the central drinking-water network.
- Main listened (4 nights)
- 35,465m
- Separate acoustic recordings
- 187count
- Distinct streets / avenues listened
- 94count
- Physical water leaks located
- 22count
- Leak density
- ~0.62leaks/km
- Daily rise in finds (4 → 7)
- +75%
Nightly breakdown
- 10 Jun · 10,116 m listened, 50 recordings, 4 leaks
- 11 Jun · 7,133 m listened, 39 recordings, 5 leaks
- 12 Jun · 11,069 m listened, 60 recordings, 6 leaks
- 13 Jun · 7,146 m listened, 38 recordings, 7 leaks
Why it matters
The number of finds did not fall — it rose, even on the lower-distance nights. This shows the area is not saturated; yield rose as the crew learned the network and the field behaviour. If the work is stopped, that learning curve and field knowledge are lost.
Economic magnitude (estimated)
If the 22 leaks found in these 4 nights alone are not repaired, on an assumption of 0.10–0.25 L/s per leak the annual loss is of the order of 69,000–173,000 m³; at ₺20/m³ that corresponds to ₺1.4–3.5 million of preventable loss a year.
Night shift · point-by-point listening
Daytime verification listening
Source: the 10–13 June 2026 daily work reports, the listening record table and 22 fault detection reports. Economic figures are estimates and are verified with the utility's data. Images represent the method.
Result
Phase 2: continue without interruption.
Verification listening in unsurveyed neighbourhoods and in the zones with dense finds; detection → repair within 48–72 hours → post-repair check. If the detection rate holds, there is potential to find about 330 leaks in 60 working nights.
Let's meet remotely
Let's assess your network together.
In a short video call we go over the current situation, the approach and the scope.