The figures below are compiled from the reports of completed work. Economic magnitudes are estimates and are verified with the utility's own data in each case.

Municipality of Kütahya project
Project · Municipality of Kütahya · Inner Aegean · 2024–2025

Network in the “critical” band: 432 faults over 348.5 km.

300 kmInitial scope · main listened
403 countInitial scope · leaks/faults found
48.5 kmTender extension · additional listening
Read the project
Municipality of Batman project
Project · Municipality of Batman · South-Eastern Anatolia · two-phase project

400 km surveyed, 220 leak points located.

400 kmMain listened acoustically (phase 1 + 2)
220 countLeak points located
~68 m³/hÇamlıca 1 reservoir · estimated physical leakage
Read the project
Municipality of Çanakkale project
Project · Municipality of Çanakkale · Marmara · 2026 · pilot

35.5 km in 4 nights, 22 leaks — and a rising learning curve.

35,465 mMain listened (4 nights)
187 countSeparate acoustic recordings
94 countDistinct streets / avenues listened
Read the project
Municipality of Keşan project
Project · Kırklareli · Municipality of Keşan · Thrace · 2026 · pilot

56.8 km in six nights, 20 leaks.

56.8 kmMain listened (6 nights)
20 countPhysical water leaks located
7 countNeighbourhoods surveyed
Read the project
Municipality of Kilis project
Project · Municipality of Kilis · South-Eastern Anatolia · 2023–2024

Mapping the loss with pressure, step and zero-pressure tests.

6 monthsDuration
24/7 loggerPressure monitoring
Step + zero-pressureTest method
Read the project
Municipality of Sivas project
Project · Municipality of Sivas · Central Anatolia · 2021

12 DMA zones, loss rate from 55% to 25%.

12 countDMA zones installed
55%Starting loss rate
25%Target / achieved loss rate
Read the project
Municipality of Rize project
Project · Municipality of Rize · Eastern Black Sea · 2021

Acoustic detection in a rainy climate, on difficult ground.

Acoustic + correlationMethod
Sloping terrain · high moistureField condition
GPS + sound level + photoRecord
Read the project
Municipality of Doğubayazıt project
Project · Ağrı · Municipality of Doğubayazıt · Eastern Anatolia · 2022

DMA-based loss reduction work.

DMA-basedApproach
Flow + acousticMeasurement
Detection → repair → verificationCycle
Read the project
Ordu · Municipality of Fatsa project
Project · Ordu · Municipality of Fatsa · Black Sea · 2021

From detection to excavation, closed-loop field work.

Acoustic listening + correlationMethod
Point confirmation by excavationVerification
Coordinates + photo + sound levelRecord
Read the project
Bodrum project
Project · Muğla · Bodrum · Aegean · 2024

A 70% fall in pipe bursts through pressure management.

70% reductionPipe bursts
30% savingEnergy cost
PRV + pressure-reducing valveSystem installed
Read the project
Mozambique · Beira project
Project · Mozambique · Beira · International · 2024

Abroad: the Beira water leak detection study.

MozambiqueCountry
BeiraCity
Acoustic listening + flow measurementMethod
Read the project

Your network could be next

Let's apply the same method in your municipality.

Start with a pilot phase and review the results together.